We installed 1.6 km of conduits in a water table via directional drilling on behalf of Canteri Bros. This allowed overhead power lines to be moved underground. In only three weeks, we were able to complete this project with minimal disturbance to the surrounding area.
We undertook a challenging project of drilling through bluestone to supply a water main to the Mortlake power station and install a recycled water main leaving the station. We developed a special mud program that would allow fallen rocks to float out of the way during drilling.
DirectBor Directional Rock Drilling also drilled boreholes to help insert a steel main under Warrnambool Highway. By requirement from Origin Energy, the principal contractor, each borehole was also grouted. This project took our team only six weeks to complete.
GHP (Gheringhap) Zone Sub Station and TQY (Torquay) Zone Sub Station feeder exit works and internal cable hauls.
Installation of approximately 10,130 metres of new HV conduit install
Hauled approximately 13,175 metres of cable
Recovered approximately 3,045 meters of redundant cable
TX – 1,240 metres of new built, conduit and cable haul, foundation prep for isolation transformer.
TX – 2000 metres of new built conduit and cable haul, foundation prep for isolation.
Asset Relocation Works for multiple LXRP (Level Crossing Removal Program) locations around Geelong & Western Melbourne. All work locations were in high-traffic areas and required coordination and cooperation with multiple companies & asset owners on site.
Footscray Hospital Feeder Upgrade Works, which consisted of complex boring through multiple third part assets at depths of up to 6 metres.
Have used Directbor on some of my projects and could not speak more highly of them, easy to deal with, attention to detail is great and defiantly made my life easier as a project manager.
- Justin C.
Have used Directbor on some of my projects and could not speak more highly of them, easy to deal with, attention to detail is great and defiantly made my life easier as a project manager.
- Justin C.
Call us today on 03 5250 1673 and enquire now regarding our services.
BROWSE OUR WEBSITE
CONTACT INFORMATION
Phone: 03 5250 1673
Email:
Address: 16-18 Success Court, Corio VIC, Australia
ABN: 67980355212
BUSINESS HOURS